TitleProduct

Water Cooling PP Film Blowing Machine with Rotary Die

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Zhejiang

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-11 02:18

  • Browse the number:

    205

Send an inquiries

Company Profile

Ruian Hongqi Plastic & Packing Machinery Co., Ltd.

By certification [File Integrity]

Contact:Ms. Wendy Pan(Mr.)  

Email:

Telephone:

Phone:

Area:Zhejiang

Address:Zhejiang

Website: http://china-pm.auto-charge.net/

PRODUCT DETAILS
A: Description
The cylinder and the screw stems of extruder are mode of high-quality alloy
steel with optimum hardness and strong corrosion resistance after precision
finishing and nitrogen treatment. The extruder can be lift up to 3meters
according to the technological requirements. Mode of film blowing: Bottom
blowing. The coiling unit adopts torque motor to keep proper tension and
make rolling even and roll-changing easy.
B: Technology Parameter
MODLE FB-G-600 FB-G-800
Suitable material PP
Layfat width of film(mm) 600 800
Thickness of film(mm) 0.015-0.08
Max.extrusion output 38kg/h 46kg/h
Screw dia(mm) Φ65 Φ75
Screw L/D 28:1
Screw rotation 10-100r/min
Main motor(kw) 15 18.5
Dia of orifice(mm) Φ250 Φ350
Tota power(kw) 28 36
Weight (T) 3 3.5
Dimension LxWxH(M) 4.8x2x4 5x2.2x4.2
C: Details Information
1. Extruder Unit
Die Head Material: Cr40 Mould Steel
Die Head Heating: 2 Zones
Rotary Die Head: Optional
Screw and Barrel Material: 38CrMoALA
Screw and Barrel Heating:3Zones*3Sets
Heating Ring Material: Cast Aluminum 
Screen Changer: Manual Type
Gear Box: Hard Tooth Surface Gear Box 


2. Take Up Section
'A' Shape Film Forming Plate: Aluminum Plate Type
Film Cooling Method: Water Cooling
Film Bubble Setting Ring: Water Ring 
Take Up Motor:Three-Phase Asynchronous Motor with Worm Gear Reducer
Take Up Rollers Grasp: Air Cylinder 

3. Winder Unit
Second Take Up Unit: Air Cylinder 
Rewinding Station: Double Stations 
Rewinding Motor: Torque Motor 
Pinch Roller: Air Shaft Roller 

D. After service of HONGQI
1. How long will your engineer reach to our factory?
Within one week after machine arrival at your factory.
2. How many days will you finish installing?
We will finish installation and training within 15days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's visa, air tickets, hotel, food, and also their salary 80USD per day per person.
4. How long of your machine's warranty period?
All our machines have one year guarantee after finishing installation.
5. How could we do after one year warranty period?
We also can offer you our best after service, of course you will afford our technician's cost.
6. Can you find us any engineer in our location?
Of course, we will check and inform you as soon as possible.

Any query please feel free to contact with us!
MS. WendyPan