Pre assembled steelframing
1. ERP System and Whole Production Route Traceability System
Huaxing EQUIPMENT has ordered the production ERP system as per its own characteristic, to realize the principle of each component only has one marking.
We realizes Raw Material Traceability System by sticking bar code on raw materials, semi-finished products, finished products and products ready for delivery, establishing systematic database procedures and scanning bar code database through code scanner.
Since the raw material passed the entry inspection and entered the plant, from cutting to painting and then to packing& delivery, the bar code will be transferred and pasted for four times for each part.
Raw Material Bar Code Retrospection
Half Product Bar Code Retrospection
Finished Product Bar Code Retrospection
Advantage :
1. Set in 2004, 200, 000 SQM workshop.80 engineers and 915 staff. Annual output 150, 000 tons.
2. Products Scope:
Steel Structure for industrial&civil fields, like power plant, steel mill, solar, hydroelectricplant, petrochemical,high-rise building, heavy Structure, workshop& warehouse, etc.
3. Service: design, manufacture and installation.
5. Our parent firm is Canada public company, total asset 4 billion, 3600 employees.
6. ISO9000, 14000, 18000 by BV France, AWS welder, EN welder
7. Exported to 60 countries, like Romania, New Zealand, Iran, UAE, Kenya, India, Indonesia,Vietnam, Saudi Arabia, Angola, Congo and Nigeria etc. Exported weight more than 200,000 tons.
2. Advantage of steelframing
Steelframing is one of many types of construction structure which uses steel and concrete as raw materials. Comparing to other types of construction structure such as reinforced concrete structure, steel frame is of higher strength-to-weight ratio and durability, lighter in terms of weight, more flexible in design, higher shock resistance, shorter construction lead time, less polluted and recyclable.
3. Specifications:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4. Why choose us:
Fast and qualified professional design.
Professional on-site guidance
Quality control to ensure the product quality
Timely service and progress
5. Our assurance of Quality
From concept to completion our assurance of Quality is built upon:
Employing only professionals who can do the job
Insisting on the highest standards of materials and workmanship
Remaining mindful of budget and programme
Satisfying legislative and regulatory requirements
6. Project case: 50m Single Span steelframing Building in Hangzhou
This steelframing building designed for workshop, the single span up to 50 meters. This is the domestic project in China Hangzhou.
1) Purlin: C section steel;
2) Roof panel: fiberglass 50mm sandwich panel;
3) Wall: with 1.2m brick wall ,75mm sandwich panel above 1.2m;
4) Tie bar: Q345B round tube;
5) Brace: round steel;
http://www.steelbuildingframe.com/