TitleProduct

IDC Data Center Network Cabinets

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Zhejiang

  • Validity to:

    Long-term effective

  • Last update:

    2019-02-24 21:05

  • Browse the number:

    190

Send an inquiries

Company Profile

Ningbo YuDa Communication Technology Co.,Ltd

By certification [File Integrity]

Contact:ningboyuda(Mr.)  

Email:

Telephone:

Phone:

Area:Zhejiang

Address:Zhejiang

Website:http://www.yudaconnect.com/ http://ningboyuda.auto-charge.net/

PRODUCT DETAILS

Product description
Place of Origin: Zhejiang, China (Mainland)
Height:42U/47U
Product name: IDC data center network cabinets WLJG-YD
Size: customized
Material: SPCC cold rolled Steel
Color: RAL9005 BLACK
Application: FTTX
Certification: ISO9001
Brand name: YUDA or OEM
Supply Ability: 5000pieces/month
Package: Wooden pallet and carton
Port: Ningbo port or required by customers.
Payment: TT payment
Delivery: Within 20 days after receiving payment. Depend on Qty.

Product background
Energy conservation and environmental protection is the main trend of social development and the goal that all enterprises must achieve.
Energy consumption is the biggest cost of data center, so the energy saving and consumption reduction of data center is the key for enterprises to save energy, reduce emission and reduce operation cost.
Since the air-conditioning load in the modern electronic information system machine room mainly comes from the heat output of the main computer equipment and external auxiliary equipment, among which the main equipment such as server, storage and network account for 80% of the heat output of the equipment.
Therefore, with the continuous increase of server integration density, the server cabinet equipment area becomes the main heat island area in the machine room.
Server devices are getting more and more heat-dense.
The lower air supply air conditioning system of the machine room takes the space under the anti-static movable floor as the air supply static pressure box of the air conditioning system.
But the wind of high density cabinet comes from the cabinet in front of the floor.
When the cold air is sent to the central cabinet, the cold air has been absorbed by the server.
Therefore, the upper part of the cabinet does not have enough cooling capacity, which will cause the equipment in the upper part of the cabinet, cannot operate normally.
Now the maximum heat dissipation of the server load in the computer room has climbed in recent years.
Original ideal under floor air supply room precision air conditioning system supply air condition unit area is the largest amount of cooling the room for 4 KW / ㎡ (configuration by much larger amount of cooling air conditioning unit to send air volume also increases accordingly, the air distribution of wind pressure is enough to give the floor to blow up), have been unable to meet their needs.

The above problems have been solved.
In the design of the machine room, the height of the electrostatic floor is increased, the ventilation rate of the floor outlet is increased, and the cold passage of the cabinet is closed.
Also can be used in the duct air supply and floor air combined with refrigeration to solve.
The cooling capacity of the air conditioning in the machine room is not wasted, and the effective utilization can greatly improve the utilization rate of the air conditioning.
In the premise of achieving room refrigeration air conditioning operation can also save energy.
Through a series of optimization of the air conditioning system, the PUE value of the entire machine room can be reduced.
In a typical data center, the equipment that consumes the most electric energy, such as air conditioning and air supply system, is the room environment adjustment equipment, which consumes about 45% of the total electric energy of the data center.
Therefore, reducing refrigeration consumption is the primary task of energy saving in the machine room.
Based on practical experience, we have customized a set of efficient, safe, stable and green energy saving solution for the machine room -- IDC cabinet closed (cold pool) system.
By improving air circulation and improving the utilization rate of refrigeration, the PUE value can be effectively reduced to extend the service life of the equipment.
At the same time to improve the growing blade server, core switch and other large heat, high-density equipment caused by hot issues.

If Order need to provide:
1.Number, model and number of IDC cabinet .
2.The cabinet layout of the data center machine room shall be provided.
3.Whether the cabinet has three-stage base plate.
4.The width of the IDC cabinet, the width is usually 1200MM, there are 1500, 1600, 1800, or other special size.
5.What kind of door is needed for the passage? There are three kinds of totemic standard passage doors: manual translation door, manual external door and automatic translation door.
6.Whether there is an empty bridge in the machine room, install the bridge after the entry of the cabinet or put the cabinet after the existing bridge. If there is a bridge in the machine room, please confirm whether the height and position of the bridge will affect the opening of the skylight of the cold passage.
There is also no bridge in the organic room, or wiring from under the electrostatic floor.
7.Is there any load-bearing column in the cold passage? If so, please provide the size of the column and the distance from the pillar to the front, back and left and right doors of the cabinet.
8.If there is any header cabinet in the cold passage, the client shall provide the header cabinet itself, and confirm the size (width, depth and height) of the header cabinet. Drawings of the header cabinet shall be provided for formal production, and holes shall be opened accordingly.
9.If there is air conditioning in the cold passage, the PDF cabinet and other cabinets should be provided with specific dimensions (width, depth and height).
10.IDC data center network cabinets top cover and through the door are equipped with 5MM thick white tempered glass, if customers need other materials, such as: PC sunshine board, fire glass, laminated tempered glass, cesium potassium glass or tempered glass thickness is greater than 5MM need to re-nuclear price.
11.If you have other special requirements, please provide explanations.

Manufacturing Equipments: 

Factory building

Our Hornor:

FAQs:
1.Why choose YuDa?
As a large communication industry manufacture in China, we have professioned staff's, and more than 20 years experience, we offer the quality goods, and competitive price, punctual delivery date.

2.What are your main products?
Joint box, distribution box, pigtail, fiber cable, network cabinet, adapter, fast connector, splice tray, etc, we also provide customized product and OEM for customers.

3.What about after-sales service?
1-2 years warranty period without man-made damage. Anything can contact with us.

4.What countries are your overseas clients?
Vietnam, India, Cambodia, Spain, Sri Lanka, the United States, Africa, etc.

5.What exhibitions has your company attended?
Mobile World Congress(MWC, Spain), Convergence (India), Cairo ICT, Netcom, SVIAZ ICT, Africacom, OFC, fiber connect, etc.

http://www.yudaconnect.com/